Photos of the Ecocentre being built.

 

The Foundations going down for the new Ecocentre

 

The Basic wood structure of the Ecocetre is put up

 

The rammed-earth thermal mass wall is finished

 

The straw bale walls are being construted.

 

The triple glazed windows and doors have been put in.

 

The electrics are being installed by Dr Helen Hill of Galaxis Energy 

 

The under floor heating is being layed down. 

 

The floor is now ready to have the recycled wood flooring layed down.

 

The ceiling is being insulated and painted.

 

The Lime Render is going on to the straw bale walls.

 

The sedum roof is being layed down.


The Ramp at the front of the Ecocentre has been put in and the garden beds defined. 



The Decking, Stairs and railings have been completed. 



The waterless Toilets have been installed and are now working. 



The out side walls have been painted a soft yellow. 



The wood floor has been put down and all the technology has been installed 


Upcoming events

events calendar
200 hour TEACHER TRAINING CERTIFICATE COURSE IN HATHA YOGA.FEB-SEPT Click here for more infomation (20/5/2012)
This course Is 12 sessions over 12 weeks.To book your place contact lizthomas10@gmail.com Or click the link to the yoga school.
Self Festival 21st to 31st May. Click for more details (21/5/2012)
Quercus Community (21/5/2012)


Farmeco.co.uk is hosted by Sustain: the alliance for better food and farming