The Foundations going down for the new Ecocentre
The Basic wood structure of the Ecocetre is put up
The rammed-earth thermal mass wall is finished
The straw bale walls are being construted.
The triple glazed windows and doors have been put in.
The electrics are being installed by Dr Helen Hill of Galaxis Energy
The under floor heating is being layed down.
The floor is now ready to have the recycled wood flooring layed down.
The ceiling is being insulated and painted.
The Lime Render is going on to the straw bale walls.
The sedum roof is being layed down.
The Ramp at the front of the Ecocentre has been put in and the garden beds defined.

The Decking, Stairs and railings have been completed.

The waterless Toilets have been installed and are now working.

The out side walls have been painted a soft yellow.

The wood floor has been put down and all the technology has been installed